Projects

Testimonials

Rippowam Cisqua School

The Rippowam Cisqua School is an independent school serving over 400 students from Pre-K to Grade 9. The Upper Campus, located in Bedford, NY, was established in 1917 and moved to its current address in 1927. The Rippowam Cisqua School is known for its unique balance of tradition and innovation.

Scope of Work:
Facilities Assessment
Campus Master Plan
Cushman House Renovations
Lower Campus Main Entry Renovations
Upper Campus Renovations + Additions
Upper + Lower Campus Consolidation Study

Eagle Hill School

The Eagle Hill School is an independent school committed to educating children with language-based learning disabilities. Founded in 1975, the school serves 260 students ages 5-15 on the grounds of the former Marjorie Merriweather Post Estate.

Scope of Work:
Facilities Assessment
Campus Master Plan
Phase I Additions + Alterations
• New Community Room
• Additions & Renovations Academic Building
Phase II Additions + Alterations
• Additions + Renovations to Hardwick House
• Staff and Student Housing Renovations

Brewster Central School District

The Brewster Central School District serves over 3,000 students on a single campus comprised of four different school building. Located in the Town of Southeast, approximately 60 miles north of New York City, the District has earned a reputation as a nationally recognized and high performing school system.

Scope of work:
Facilities Assessment
Campus Master Plan
Building Conditions Surveys + Five Year Plans
HH Wells Middle School Phase I Additions + Alterations
HH Wells Middle School Phase II Additions + Alterations
New Synthetic Turf Athletic Field
New Concession Stand
Alterations to Transportation Facility
District Wide Security Project
Brewster High School Learning Commons
CV Starr Intermediate School Additions + Alterations
JFK Elementary School Additions + Alterations

Services

Planning

  • Master Planning
  • Building Condition Surveys / Five Year Plans
  • Conceptual Design Studies + Budgeting

Architecture

  • Programming
  • Design
  • Cost Estimates
  • Code Evaluation
  • Building Information Modelling (BIM)
  • Coordination of Project Team + Consultants

Construction Administration

  • Contract Documents
  • Bidding Administration
  • Contract Negotiations
  • Construction Inspection + Administration

Support Services

  • Communications Support
  • Pre-Referendum Communications
  • Fundraising Strategies + Support
  • Graphic Design
  • Approvals + Project Submittals
  • Signage Design + Graphics Plans
  • Multi-Media + Video Presentation

Interior Design

  • Space/Functional Planning
  • Lighting & Acoustics
  • Furniture Budgeting, Design, + Selection
  • Interior Finishes Selection

Responsible Design

Sustainable Design

Through an integrative design process, KG+D strives to create architecture that is environmentally responsible, adaptable, and enduring in all our projects. In collaboration with our clients, we balance sustainability, constructability, and budget, to create meaningful designs unique to each project.


A few of our most notable sustainable projects include:

The Media Arts Lab at Jacob Burns Film Center received LEED Gold in 2010 and promotes a well-rounded approach to sustainability achieving credits balanced across all five LEED categories. The building is outperforming its energy model at 50% more energy efficient than baseline.

The replacement Post Road Elementary School for the White Plains Public Schools was designed to meet the criteria for LEED for Schools at the Gold Level and has been touted by NYSERDA as the “Greenest School in New York State.” In 2010 this new building earned an Energy Star rating of 100.

The H.H. Wells Middle School addition in the Brewster Central School District is designed to achieve NYS CHPS certification. This addition to the existing middle school provides classrooms flooded with controlled, natural light with fresh air modulated to achieve good indoor air quality without wasting energy due to its energy recovery systems.

Middletown High School completed a major addition project that included the development of a central innovation lab. The innovation lab was fit into an underused interior courtyard space and adjacent spaces are renovated into innovative learning spaces. The interior additions brings natural light into the space through clerestory windows and features a green roof.

New Hutchinson Elementary School was recently completed and designed to a LEED Silver equivalent. Features include high efficiency HVAC equipment, energy recovery ventilation, LED lighting, daylighting and a high-performance building envelope.

Social Responsibility

KG+D is committed to social reasonability, and we believe that active participation within the communities in which we work and serve is a core component to building better communities. As such, our firm’s participation includes a wide range of activities including financial donations, volunteering to serve in professional associations and not for profit organization and pro bono projects for community-based organizations.