Location:Purchase, NY
Size:116,745 square feet
Completion Date:2017
Awards:AIA WHV Special Mention
The 1973 Physical Education Building was designed by the campus master plan architect, Edward Larrabee Barnes. It had many masonry issues, an inaccessible main entrance, a failed roof and 200-foot-long ridge skylight. A completely re-designed main entry sequence includes a new plaza, a channel glass vestibule, a curved balcony that connects the entry to the elevator. All of the windows and the ridge skylight were replaced utilizing brighter energy efficient framing and glazing. The most pressing needs were not only addressed but also the causes for the problems were diagnosed and solved within the original budget constraints. This results in a renewed facility that is brighter, more energy efficient and a healthier indoor environment.