Monthly Archives: December 2015

Trinity Pawling School – Scully Dining Hall

trinity1

trinity2

trinity3

trinity4

trinity5

Client:
Trinity Pawling School

Project Scope:
The objectives for the Scully Dining Hall project were to increase capacity to serve the entire student and faculty community in one seating and create a cornerstone to enhance the presence of the north entrance to campus. Scully Hall is 40% larger and operates 30% more efficiently than the building it replaced. The centerpiece is a 6,000sf main dining room that seats 400 diners at round tables beneath dramatic curved heavy timber trusses and clerestory windows.

Completion Date:
2009

Distinctions:
LEED Certification pending

Henry H. Wells Middle School

brewster1

brewster2

brewster3

brewster7

brewster4

brewster6

Client:
Brewster Central School District

Project Scope:
This middle school renovation project remade an aging traditional 1957 building into a vibrant 21st Century school. In addition to extensive renovations to the existing building, new additions include a 26,000sf 3-level brick and block science wing, a new library addition, new stairwell addition and front entrance canopy. As a part of the District’s mandate for an environmentally conscious building, the design also included high-performance and high-efficiency design solutions.

Completion Date:
2012

Awards:
Citation Award for Architectural Excellence, AIA Westchester/Hudson Valley Chapter

Distinctions:
Designed to achieve NYS CHPS Certification

Dobbs Ferry Middle/High School Cafeteria

Dobbs Ferry School

Dobbs Ferry School

Client:
Dobbs Ferry Union Free School District

Project Scope:
Dobbs Ferry Union Free School District sought to transform their middle/high school cafeteria into an inviting cafeteria commons and create a resource for the Dobbs Ferry community. The reorganized and redesigned cafeteria features a more flexible configuration, utilizes natural light and the adjacent courtyard, created improved circulation and provided for more efficient kitchen and servery facilities.

Completion Date:
2014

Dobbs Ferry UFSD Athletic Field

Client:
Dobbs Ferry Union Free School District

Project Scope:
KG+D completed a turf field replacement project as part of a larger capital project for Dobbs Ferry Union Free School District. These improvements included a replacement synthetic turf field with 5 sport inlays, new parking, scoreboard and bleacher system.

Completion Date:
September 2016